Our design sets out to demonstrate an ecological approach to tower design. Besides meeting the Client’s program requirements for an exposition tower (i.e. for retail, exhibition spaces, auditorium uses, etc.), the design has the following ecological responses:


Response to the Site’s Ecology

Ecological design starts with looking at the site’s ecosystem and its properties. Any design that do not take these aspects of the site into consideration is essentially not an ecological approach.

A useful start is to look at the site in relation to an “hierachy of ecosystems” (see below):

Ecosystem
Hierarchy
Site Data
Requirements
Design
Strategy
Ecologically-MatureComplete Ecosystem
Analysis and Mapping
Preserve
Conserve
Develop only on no-impact
areas
Ecologically-ImmatureComplete Ecosystem
Analysis and Mapping
Preserve
Conserve
Develop only on least-
impact areas
Ecologically-SimplifiedComplete Ecosystem
Analysis and Mapping
Preserve
Conserve
Increase biodiversity
Develop only on low-
impact areas
Mixed-ArtificialPartial Ecosystem
Analysis and Mapping
Increase biodiversity
Develop on low-impact
areas
MonoculturePartial Ecosystem
Analysis and Mapping
Increase biodiversity
Develop in areas of non-
productive potential
Rehabilitate ecosystem
ZerocultureMapping of remaining
ecosystem components
(e.g. hydrology, remaining
trees, etc.)
Increase biodiversity and
organic mass
Rehabilitate ecosystem

From this hierachy, it is evident that this site is an urban “zero culture” site and is essentially a devastated ecosystem with little of its original top soil, flora and fauna remaining. The design approach is to re-habilitate this with organic mass to enable ecological succession to take place and to balance the existent inorganicness of this urban site.

The unique design feature of this scheme is in the well-planted facades and vegetated-terraces which have green areas that approximate the gross useable-areas (i.e. GFA @ 6,033 sq.m.) of the rest of the building.

The vegetation areas are designed to be continous and to ramp upwards from the ground plane to the uppermost floor in a linked landscaped ramp. The design’s planted-areas constitute 3,841 sq.m. which is @ ratio 1 : 0.5 of gross useable area to gross vegetated area.

Design began with the mapping in detail of the indigenous planting within a 1 mile radius vicinity of the site to identify species to be incorporated in the design that will not compete with the indigenous species of the locality.

images by T.R. Hamzah & Yeang

   
Place Making

A crucial urban design issue in skyscraper design is poor spatial continuity between street-level activities with those spaces at the upper-floors of the city’s high-rise towers. This is due to the physical compartmentation of floors (inherent in the skyscraper typology).

Urban design involves ‘place making’. In creating ‘vertical places’, our design brings ‘street-life’ to the building’s upper-parts through wide landscaped-ramps upwards from street-level. Ramps are lined with street-activities: (stalls, shops, cafes, performance spaces, viewing-decks etc.), up to first 6 floors.

Ramps create a continuous spatial flow from public to less public, as a “vertical extension of the street” thereby eliminating the problematic stratification of floors inherent in all tall buildings typology. High-level bridge-linkages are added to connect to neighbouring buildings for greater urban-connectivity.

images by T.R. Hamzah & Yeang
 

Views to the Surrounding

A “views analysis” was carried out to enable upper-floor design to have views of surroundings.
 

“Loose-Fit” 

Generally, buildings have life-spans of 100-150 years and change usages over-time. The design here is ‘loose-fit’ to facilitate future reuse. Features include: 

‘Skycourts’ (i.e. convertable for future office use)
Removable partitions
Removable floors
“Mechanical-jointing” of materials (as against to chemical bonding) to facilitate future recovery.
Flexible design (e.g. initially a multi-use expo building, its future use may be offices [nett lettable area of 9,288 sq.m. @ 75% efficiency] or apartments).
   
A set of plans to show conversion to office use has also been prepared @ 75% net to gross floor efficiency.
   

Vertical Landscaping

Vegetation from street-level spirals upwards as a continuous ecosystem facilitating species migration, engendering a more diverse ecosystem and greater ecosystem stability and to facilitate ambient cooling of the facades.

As mentioned earlier, species are selected not to compete with others within surroundings. “Vegetation percentages” represent of area’s landscape character. Factors influencing planting selection are:

Planting depths
Light Quality
Maintenance level
Access
Orientation
Wind-walls / solar-panels / special glazing
   
Vegetation placements within the tower at different heights respond to the microclimates of each individual sub-zone at the tower.

Image by Isni Parra

   
Water-Recycling 

Water self-sufficiency (by rainwater-collection and grey-water reuse) in the tower is at 55.1%:

Total gross area = 6,032 sq.m.
Water requirements = 20 gallons/day/10 sq.m. gross area + 10% wastage
Total requirements = (6,032 ÷ 10 x 110%) x 20 gallons= 13,270 per gallon/day = 60.3 m3 per day x 365 days  = 22,019 m3 annum
Total rain-fall catchment area = 518 sq.m.
Singapore average rainfall / annum = 23.439m
Total rain-water collection = 12,141 m3 per annum
Water self sufficiency = 12,141 ÷ 22,019 x 100 = 55.1%

Image by Isni Parra
   

Water-Purification 

Rainwater-collection system comprises of ‘roof-catchment-pan’ and layers of ‘scallops’ located at the building’s facade to catch rain-water running off its sides. Water flows through gravity-fed water-purification system, using soil-bed filters.

The filtered-water accumulates in a basement storage-tank, and is pumped to the upper-level storage-tank for reuse (e.g. for plant-irrigation and toilet-flushing). Mains water is only here for potable needs.


Sewage Recycling

The design optimises recovery and recycling of sewage waste:

Estimated sludge = 230/P.E. / day @ 3. P.E. per 100 m2 GFA
Building GFA = 6,032 sq.m.
Sewage sludge collected/day = 230 litres x 6,032 ÷ 100 x 3= 41,620.8 litres or 41.62 m3/day = 15,190 m3/ annum
   
Sewage is treated to create compost (fertilizer for use elsewhere) or bio-gas fuel.
   

Solar Energy Use

Photovoltaics are used for greater energy self-sufficiency.

Average photovoltaic-cell energy output = c. 0.17 kWh sq.m.
Total sunlight hours per day = 12 hours
Daily energy output = 0.17 x 12 = 2.04 kWh sq.m.
Area of photovoltaic = 855.25 sq.m.
Total daily energy output = 1,744 kWh
Estimated energy consumption @ 0.097 kWh /sq.m. enclosed & 0.038 kWh/sq.m. unenclosed  = (0.097 x 3,567 sq.m.) + (0.038 x 2,465 sq.m.) = 439.7 kWh
Estimated daily energy consumption = 10 hrs x 439.7  = 4,397 kWh
% self sufficiency is 1,744 ÷ 4,397 = 39.7%
   

Building Materials Recycling and Reuse 

Design has an in-built waste-management system. Recycleable materials are separated at source by hoppers at every floor. These drop-down to the basement waste-separators, then taken elsewhere by recycling garbage collection for recycling. 

Expected recycleable waste collected /annum: 

paper / cardboard = 41.5 metric-tonnes
glass / ceramic = 7.0 metric-tonnes
metal = 10.4 metric-tonnes
   
The building is designed to have mechanically-joined connections of materials and its structural connections to facilitate future reuse and recycling at the end of building’s useful-life.


Natural Ventilation & “Mixed-Mode” Servicing

The options for the M&E servicing modes for any ecological building are: 

passive mode
background (mixed) mode
full (specialised) mode
   
The design here optimises on the locality’s bioclimatic responses using ‘mixed mode” M&E servicing. Mechanical air-conditioning and artificial-lighting systems are reduced. Ceiling-fans with de-misters are used for low-energy comfort-cooling.

Wind is used to create internal conditions of comfort by “wind-walls” that a placed parallel to the prevailing wind to direct wind to internal spaces and skycourts for comfort cooling.


 Image by Isni Parra


Embodied Energy and CO2

Embodied-energy studies of the building are useful to indicate the building’s environmental impacts. Subsequently, estimates of CO2 emissions arising from building materials production may be made. Design’s embodied-energy (prepared by our expert) is:


ElementGJ/sq.m. GFA
Structural System• Excavation
• Steel and concrete
• Formwork
764.0
43,850.2
3,113.10
Floor• Steel
• Timber & other material
• Staircases & railings
• Floor finishes
13,013.10
22,648.00
1,752.50
7,793.00
External wall• Curtain wall and bricks
• Aluminium cladding
• Solar panels
5,550.30
2,864.50
12,435.70
External wall and partitions• Bricks
• Other materials
5,482.20
6,078.30
Roof and ceilings• Concrete & membrane
• Water catchment and
drainage
• Ceiling
5,439.00
8,439.80

1,390.70
Fittings• Doors
• Sanitary fittings
1,736.60
490.20
Total:142,841.20

   
Energy sources affect CO2 emissions associated with embodied-energy. If the majority of energy sources is petroleum-related (with some gas and electricity), 80 kg CO2 per GJ of energy averages. The building here is associated with emissions of c. 11.5 thousand tonnes CO2.

Embodied-energy ratio to gross floor area (GJ/m2 GFA) is generally between 6 and 8, but may be more depending on methodology used. The design’s ratio is at the high end (@ 14.2 GJ/m2 GFA) but differs from others since using solar-panels having high embodied-energy will significantly offset operational-energy saved over building-life. High embodied-energy materials used (e.g. aluminium and steel) are however easily recycleable and therefore halving their embodied-energy when reused. Replacing concrete floors with composite timber-floors casettes will reduce embodied-energy by c. 10,000 GJ.

 Image by Isni Parra


Facts

Client: 
URA (Urban Redevelopment Authority) Singapore (Sponsor)
EDITT (Ecological Design in The Tropics) (Sponsor)
NUS (National University of Singapore) (Sponsor) 

Date Start: 
1998 (Competition: design)
Completion Date: 
Pending 

Areas: 
Total gross area: 6,033 sq.m. 
Total nett area: 3,567.16 sq.m.
Total area of plantation: 3,841.34 sq.m. Location: 
Junction of Waterloo Road and Victoria Street, Singapore 

Nos. of Storeys: 26 Storeys 

Site Area:838 sq.m. 

Plot Ratio: 7.1

Project Team :  
Principal-in-charge: 
Dr. Ken Yeang

Design Architects :
Ridzwa Fathan (PIC)
Claudia Ritsch
Azman Che Mat

Design Team :
Azuddin Sulaiman
See Ee Ling Project Architect: 
Andy Chong

Drafting :Sze Tho Kok Cheng

C&S and M&E Engineers : Battle McCarthy (London)

Embodied Energy Expert : Bill Lawson (University of Sydney)

Swan & Maclaren Architects : James Leong (Architect-of-Record)

Friday, 20 June 2014

gippsland water factory vortex centre

image by DesignInc



Description

The Gippsland Water Factory’s Vortex Centre houses office and laboratory functions and an interpretive experience for a major new water recycling plant which was recently completed near Morwell in Gippsland. The vortex form of the building strongly expresses the dynamic movement of fluids down a pipe, at the same time providing a unique internal environment.

image by DesignInc


Combining cost performance, aesthetics, water education and ecological intelligence, the 650m2 facility is a beacon of exemplary sustainable design. Inherent in the design and interpretive message is the celebration and conservation of water – the essence of the Gippsland Water Factory. The centre was designed as a building that teaches.

image by DesignInc


The inspiration for the Vortex Centre is the notion of a giant oculus shaped structure that hangs off the side of the massive membrane bioreactor tank that forms part of the Water Factory. The Vortex’s shell is made up of seven barrels that fit into one another as they decrease in size, thereby resembling a vortex.

image by DesignInc


The structure is built over an artificial lake that delivers cooling to the building together with other passive environmental measures, including natural ventilation and thermal convection. Due to the stable temperature of the lake, the building delivers a very low energy summer outcome. Cool water from the bottom of the lake is passed through heat exchangers, delivering cool air into the interior. At night, the lake water is pumped over the roof to be cooled for use during the day. In winter, waste heat from a biogas powered cogeneration system will be used to heat the interior. The combination of these design principles ensures the Vortex is a low user of natural gas and power from the electricity grid.

image by DesignInc

At the entry to the Vortex, transparent pneumatic ETFE cushions incorporate variable skins allowing the façade to be ‘tuned’, admitting or excluding sunlight for different seasons and daily conditions.

image by DesignInc

The Vortex will impress first time visitors and looks to provide regular return visitation by school groups and the public alike – one of the best measure’s of the facility’s success.

image by DesignInc


Facts

Year: 2010
Location: Victoria
Client: Gippsland Water Factory Alliance
Value: $5M
Awards: United Nations Association of Australia
               World Environment Day Awards 2011
               Green Building Award

image by DesignInc


Monday, 7 April 2014

water building resort

image by Orlando de Urrutia




Description

WATER BUILDING RESORT, is a sustainable building of postmodern generation (HITECH), it was designed architecturally and inspired by the form of a DROP OF WATER when falling from the heights. It is a sustainable building, projected and thought to create conscience of the water.
WATER BUILDING RESORT not contributed alone the knowledge and culture to the coming generations, if not also financial profitability for their promoters and investors.


image by Orlando de Urrutia


The use is a dedicated Resort with an Acuarium, Restaurants, Gyms, Hotel, Spa service, Congresses, Conferences and permanents or itinerant Exhibitions rooms. Whose main dedications (among other) they will be thematic related with the universe of the Water, the environment and the renewable energy, their use, solutions, supplies, use and investigation (I+D).The building also harbors a Center of technological investigation (Cidemco) which will control certifications of industrial product of quality. 


image by Orlando de Urrutia


The design of the building allows integrating the renewable energy as reception and optimization. The facade guided in the sun, cover by photovoltaic glasses of the last technology that allow transparency and they capture the solar energy to give electricity of the build.


image by Orlando de Urrutia


The opposed facade in the sun, are lattices that allows the air entrance and it will be drive trough the equipment producing of drinkable water. The air when going by the central yard its aped increases and it leaves for a superior air generator , generating the electricity for another equipment.


image by Orlando de Urrutia


WATER BUILDING RESORT, will be the first build in the world that transform the air into water, to obtain water starting from the air it seems a science fiction , however it is a reality thanks a new and modern technology TeexMicron incorporated in this building.


image by Orlando de Urrutia

Their production based on the condensation of the humidity that is in the air, its location in the water of the sea, add a big value regarding a bigger condensation., allowing to take advantage a daily evaporation and the night condensation.


image by Orlando de Urrutia


On the other hand WATER BUILDING RESORT will recycle the water taking the rain water and marine water too, purifying it with equipment incorporated in the base of the build. The generator of water TeexMicron allow to produce 5.000 liters of water for each volume of 21,17 m3 / 48 people, for the calculation we will use an average of 105 liters for persons. The equipment of 5.000 liters will work in temperatures condition from 20o to 40 o and a humidity between 30% at 95%.


image by Orlando de Urrutia